Complete the code to declare a clock signal in Verilog.
reg [1];The clock signal is usually named clk and declared as a reg type in Verilog.
Complete the code to create a positive edge triggered always block.
always @([1] clk) begin
// logic here
endThe posedge keyword triggers the block on the rising edge of the clock.
Fix the error in the code to correctly assign a value inside an always block.
always @(posedge clk) begin
[1] = data_in;
endInside an always block, you must assign to a reg type variable, not a wire.
Fill both blanks to create a combinational always block sensitive to inputs a and b.
always @([1] or [2]) begin out = a & b; end
A combinational block should be sensitive to all inputs it uses, here a and b.
Fill all three blanks to create a timing constraint for a clock named clk with a period of 10ns.
create_clock -name [1] -period [2] -waveform {0 [3]
The clock name is clk, period is 10ns, and waveform rising edge is at 0ns, falling edge at 5ns (half period).
