0
0
Solidworksbi_tool~15 mins

Why fully defined sketches matter in Solidworks - Business Case Study

Choose your learning style9 modes available
Scenario Mode
👤 Your Role: You are a product design analyst at a manufacturing company.
📋 Request: Your manager wants a report showing how fully defined sketches in SolidWorks improve design accuracy and reduce rework time.
📊 Data: You have data on multiple design projects including the number of sketches, how many were fully defined, number of design errors found, and rework hours logged.
🎯 Deliverable: Create a dashboard that compares projects with fully defined sketches versus those without, showing impact on errors and rework time.
Progress0 / 6 steps
Sample Data
ProjectTotal SketchesFully Defined SketchesDesign ErrorsRework Hours
Alpha505025
Beta4530815
Gamma606013
Delta40201020
Epsilon555536
1
Step 1: Calculate the percentage of fully defined sketches for each project.
Add a calculated column: Fully Defined % = (Fully Defined Sketches / Total Sketches) * 100
Expected Result
Alpha: 100%, Beta: 66.7%, Gamma: 100%, Delta: 50%, Epsilon: 100%
2
Step 2: Create a scatter plot with 'Fully Defined %' on the X-axis and 'Design Errors' on the Y-axis.
Configure scatter plot: X = Fully Defined %, Y = Design Errors, Points = Projects
Expected Result
Shows that projects with higher fully defined % have fewer design errors.
3
Step 3: Create a bar chart comparing 'Rework Hours' for projects with 100% fully defined sketches versus those below 100%.
Group projects by Fully Defined % = 100% or < 100%, sum Rework Hours for each group
Expected Result
Projects with 100% fully defined sketches have significantly lower rework hours.
4
Step 4: Add a summary card showing average design errors for projects with 100% fully defined sketches.
Average Design Errors (100% fully defined) = AVERAGE of Design Errors where Fully Defined % = 100%
Expected Result
Average design errors = 2
5
Step 5: Add a summary card showing average design errors for projects with less than 100% fully defined sketches.
Average Design Errors (<100% fully defined) = AVERAGE of Design Errors where Fully Defined % < 100%
Expected Result
Average design errors = 9
6
Step 6: Create a dashboard layout combining the scatter plot, bar chart, and summary cards with clear titles and labels.
Arrange visuals with titles: 'Fully Defined Sketches vs Design Errors', 'Rework Hours by Sketch Definition', 'Average Design Errors Summary'
Expected Result
Dashboard clearly shows the benefits of fully defined sketches on reducing errors and rework.
Final Result
--------------------------------------------------
| Fully Defined Sketches vs Design Errors (Scatter) |
| 100% fully defined projects cluster at low errors |
|                                                  |
| Rework Hours by Sketch Definition (Bar Chart)    |
| 100% fully defined: low rework hours              |
| <100% fully defined: higher rework hours          |
|                                                  |
| Average Design Errors Summary                      |
| 100% fully defined: 2 errors                       |
| <100% fully defined: 9 errors                      |
--------------------------------------------------
Projects with fully defined sketches have fewer design errors.
Fully defined sketches reduce rework hours significantly.
Ensuring sketches are fully defined improves design accuracy and efficiency.
Bonus Challenge

Add a time trend line showing how the percentage of fully defined sketches changed over multiple projects and its impact on errors over time.

Show Hint
Use project dates or sequence to plot Fully Defined % and Design Errors over time to identify improvement trends.