This table shows a part named 'Bracket' with its material cost, labor hours, labor rate, overhead percentage, and a column for total cost to be calculated.
| Cell | Value |
|---|---|
| A1 | Part |
| B1 | Material Cost |
| C1 | Labor Hours |
| D1 | Labor Rate |
| E1 | Overhead % |
| F1 | Total Cost |
| A2 | Bracket |
| B2 | 50 |
| C2 | 2 |
| D2 | 30 |
| E2 | 20% |
