Costing tool for estimation in Solidworks - Step-by-Step Guide

Choose your learning style10 modes available
Introduction
The costing tool in SolidWorks helps you estimate the manufacturing cost of your design. It calculates costs based on materials, processes, and quantities, so you can plan budgets and pricing accurately.
When you want to know how much it will cost to make a part before production.
When comparing different materials to see which is more cost-effective.
When adjusting design features to reduce manufacturing expenses.
When preparing a quote for a customer based on your design.
When tracking cost changes as you update your model.
Steps
Step 1: Open your part or assembly file
- SolidWorks main window
Your design appears on screen ready for costing analysis
Step 2: Click the 'Evaluate' tab
- CommandManager toolbar
Evaluation tools including Costing become visible
Step 3: Click the 'Costing' button
- Evaluate tab
Costing PropertyManager opens on the right side
Step 4: Select the manufacturing process
- Costing PropertyManager under 'Process' dropdown
Process options like machining, sheet metal, plastic injection, or casting appear
Step 5: Choose the material
- Costing PropertyManager under 'Material' dropdown
Material options relevant to the process are listed
Step 6: Enter quantity to produce
- Costing PropertyManager in 'Quantity' field
Costing tool adjusts calculations based on volume
Step 7: Review the cost summary
- Costing PropertyManager summary section
Displays estimated cost per part and total cost for quantity
Before vs After
Before
No cost information shown; design file open with no cost estimates
After
Costing PropertyManager shows estimated cost per part as $45.30 and total cost for 100 parts as $4,530
Settings Reference
Process
📍 Costing PropertyManager under 'Process' dropdown
Selects the manufacturing method to base cost calculations on
Default: Machining
Material
📍 Costing PropertyManager under 'Material' dropdown
Defines the material type for cost estimation
Default: Aluminum
Quantity
📍 Costing PropertyManager 'Quantity' field
Sets the number of parts to produce, affecting cost scaling
Default: 1
Custom Costing Templates
📍 Tools > Options > Costing
Allows customization of cost rates and factors for accuracy
Default: Standard templates provided by SolidWorks
Common Mistakes
Not selecting the correct manufacturing process
Cost estimates will be inaccurate if the process does not match how the part will be made
Always choose the process that matches your actual manufacturing method
Using default material without checking if it matches the design
Material costs vary widely and affect the total cost significantly
Verify and select the exact material used in your design
Ignoring quantity input and leaving it at 1
Cost per part can decrease with higher quantities due to efficiencies
Enter the correct production quantity to get realistic cost estimates
Summary
The costing tool estimates manufacturing costs based on process, material, and quantity.
Selecting the correct process and material is key to accurate cost estimation.
Adjust quantity to see how costs scale with production volume.

Practice

(1/5)
1.

What is the main purpose of the SolidWorks costing tool?

easy
A. To create 3D animations of the design
B. To simulate the physical behavior of parts
C. To estimate manufacturing costs from a CAD model
D. To generate marketing materials automatically

Solution

  1. Step 1: Understand the costing tool function

    The costing tool analyzes the CAD model to estimate how much it will cost to make the part.
  2. Step 2: Compare options

    Other options like animation or simulation are not related to cost estimation.
  3. Final Answer:

    To estimate manufacturing costs from a CAD model -> Option C
  4. Quick Check:

    Costing tool = cost estimation [OK]
Hint: Costing tool = cost estimation from model [OK]
Common Mistakes:
  • Confusing costing with simulation
  • Thinking it creates animations
  • Assuming it generates marketing content
2.

Which of the following is the correct way to start a costing analysis in SolidWorks?

CostingTool.StartAnalysis()

easy
A. CostingTool.RunEstimate()
B. CostingTool.BeginCosting()
C. CostingTool.InitCost()
D. CostingTool.StartAnalysis()

Solution

  1. Step 1: Identify the correct method name

    The method StartAnalysis() is the correct syntax to begin costing analysis in SolidWorks API.
  2. Step 2: Check other options

    Other method names like BeginCosting(), InitCost(), and RunEstimate() are incorrect or do not exist.
  3. Final Answer:

    CostingTool.StartAnalysis() -> Option D
  4. Quick Check:

    Correct method = StartAnalysis() [OK]
Hint: Look for method with 'Start' and 'Analysis' words [OK]
Common Mistakes:
  • Using incorrect method names
  • Confusing initialization with analysis start
  • Assuming similar sounding methods exist
3.

Given the following costing parameters:
MaterialCost = 10
LaborCost = 5
MachineCost = 3
What is the total estimated cost calculated by TotalCost = MaterialCost + LaborCost + MachineCost?

medium
A. 18
B. 15
C. 10
D. 8

Solution

  1. Step 1: Add material, labor, and machine costs

    MaterialCost (10) + LaborCost (5) + MachineCost (3) = 10 + 5 + 3 = 18
  2. Step 2: Confirm total cost calculation

    The formula sums all costs correctly to get total cost.
  3. Final Answer:

    18 -> Option A
  4. Quick Check:

    Sum costs = 18 [OK]
Hint: Add all cost components for total [OK]
Common Mistakes:
  • Adding only two costs
  • Mixing up cost values
  • Forgetting to sum machine cost
4.

Identify the error in this costing calculation snippet:

MaterialCost = 12
LaborCost = '5'
TotalCost = MaterialCost + LaborCost

medium
A. TotalCost calculation is correct
B. LaborCost is a string, causing a type error
C. MaterialCost should be a string
D. Missing semicolon after LaborCost

Solution

  1. Step 1: Check variable types

    MaterialCost is a number (12), but LaborCost is a string ('5'), which cannot be added directly.
  2. Step 2: Identify error in addition

    Adding number and string causes a type error in most languages.
  3. Final Answer:

    LaborCost is a string, causing a type error -> Option B
  4. Quick Check:

    Type mismatch = error [OK]
Hint: Ensure all costs are numbers before adding [OK]
Common Mistakes:
  • Ignoring data types
  • Assuming implicit conversion
  • Thinking semicolon is required
5.

You want to estimate the cost of a part with variable material thickness. The costing tool allows you to set a parameter Thickness that affects material cost. If material cost per unit thickness is $4, and thickness is 2.5 units, what is the material cost?

hard
A. $10
B. $6.5
C. $8
D. $12

Solution

  1. Step 1: Understand cost calculation

    Material cost = cost per unit thickness * thickness = 4 * 2.5
  2. Step 2: Calculate total material cost

    4 * 2.5 = 10
  3. Final Answer:

    $10 -> Option A
  4. Quick Check:

    4 x 2.5 = 10 [OK]
Hint: Multiply unit cost by thickness [OK]
Common Mistakes:
  • Adding instead of multiplying
  • Using wrong thickness value
  • Confusing units and cost