What if you could order your PCBs without endless emails and costly mistakes?
Why Ordering PCBs from fabricators in PCB Design? - Purpose & Use Cases
Imagine you have designed a printed circuit board (PCB) and now you need to order it from a fabricator. You manually gather all the design files, check specifications, and email multiple fabricators one by one to get quotes and confirm details.
This manual process is slow and confusing. You might miss important details like layer counts or material types. Emails get lost or misunderstood, causing delays and errors in your order. Tracking multiple quotes and revisions by hand is frustrating and error-prone.
Using a streamlined ordering system or BI tool helps you automate file preparation, specification checks, and communication with fabricators. It ensures accuracy, speeds up the quote process, and keeps all order information organized in one place.
Send email with files and specs to fabricator A Wait for reply Repeat for fabricator B
Upload design to platform
Select fabricators
Get instant quotes and order confirmationYou can quickly compare fabricators, avoid costly mistakes, and get your PCBs manufactured faster and with confidence.
A hardware startup uses an ordering platform to send their PCB designs to multiple fabricators at once, instantly receiving quotes and tracking orders, saving weeks of back-and-forth communication.
Manual ordering is slow and error-prone.
Automated tools streamline communication and file handling.
Faster, accurate orders lead to quicker product development.
Practice
Solution
Step 1: Understand the role of PCB fabrication
PCB fabrication is the process of making a physical printed circuit board from a design.Step 2: Identify the purpose of ordering PCBs
Ordering PCBs from fabricators allows you to get a real board for testing or production use.Final Answer:
To turn your design into a physical board for testing or production -> Option BQuick Check:
PCB ordering = physical board creation [OK]
- Confusing PCB fabrication with software coding
- Thinking PCB ordering creates simulations
- Assuming it produces 3D models instead of physical boards
Solution
Step 1: Identify the standard file format for PCB fabrication
Gerber files contain the detailed layer information needed by fabricators to produce PCBs.Step 2: Compare with other file types
JPEG, Word, and MP3 files do not contain PCB manufacturing data and are irrelevant for fabrication.Final Answer:
Gerber files -> Option CQuick Check:
Gerber files = PCB manufacturing data [OK]
- Submitting image files instead of Gerber files
- Confusing documentation files with fabrication files
- Not knowing the correct file format for PCB production
Solution
Step 1: Analyze delivery times
Fabricator A delivers in 7 days, Fabricator B in 14 days.Step 2: Consider urgency
If PCBs are needed urgently, faster delivery is more important than cost.Final Answer:
Fabricator A because of faster delivery -> Option AQuick Check:
Urgent need = choose faster delivery [OK]
- Choosing cheaper option despite urgent need
- Ignoring delivery time importance
- Thinking ordering both is always best
Solution
Step 1: Understand Gerber file requirements
Fabricators require all necessary layers (copper, solder mask, silkscreen, etc.) to produce PCBs.Step 2: Identify common error cause
An incomplete set of Gerber layers causes errors during file validation.Final Answer:
Missing one or more required Gerber layers -> Option AQuick Check:
Incomplete Gerber layers = error [OK]
- Assuming file size causes error
- Sending wrong file types
- Thinking fabricators reject Gerber files
Solution
Step 1: Understand importance of specification matching
Fabricators have limits on board thickness, layers, finishes, and trace widths they can produce.Step 2: Verify fabricator capabilities
Reviewing the fabricator's specification sheet ensures your requirements are supported before ordering.Final Answer:
Check the fabricator's specification sheet for supported thickness, layers, finish, and trace width -> Option DQuick Check:
Confirm specs with fabricator before ordering [OK]
- Assuming fabricator can produce any specs
- Not communicating specs clearly
- Relying on fabricator to guess requirements