Consider a PLC program using two timers: Timer1 (T1) set for 10 seconds and Timer2 (T2) set for 5 seconds. T2 starts only after T1 finishes. What is the total delay before T2's done bit is set?
PLC Programming
T1 preset = 10s; T2 preset = 5s; T2 starts when T1 done;
Attempts:
2 left
💡 Hint
Think about how the timers run one after another, not at the same time.
✗ Incorrect
Timer1 runs for 10 seconds first. After it finishes, Timer2 runs for 5 seconds. Total delay is 10 + 5 = 15 seconds.
🧠 Conceptual
intermediatePurpose of cascading timers in PLCs
Why do PLC programmers use cascading timers instead of a single long timer for very long delays?
Attempts:
2 left
💡 Hint
Think about hardware or software limits on timer values.
✗ Incorrect
Many PLC timers have maximum preset values. Cascading timers allow longer delays by chaining shorter timers, improving accuracy and reliability.
🔧 Debug
advancedIdentify the error in cascading timer logic
This PLC timer logic is intended to create a 30-second delay using three 10-second timers in cascade. What is the error?
Timer1 starts immediately.
Timer2 starts when Timer1 done bit is ON.
Timer3 starts when Timer1 done bit is ON.
What is wrong?
Attempts:
2 left
💡 Hint
Check the start conditions for each timer carefully.
✗ Incorrect
Timer3 starting on Timer1 done means Timer2 and Timer3 run simultaneously, not in cascade. Timer3 should wait for Timer2 done to ensure sequential timing.
🚀 Application
advancedCalculate total delay with cascading timers and offsets
You have three timers in cascade: T1 = 8s, T2 = 12s, T3 = 5s. T2 starts 2 seconds after T1 done bit is ON, and T3 starts immediately after T2 done bit is ON. What is the total delay from T1 start to T3 done bit ON?
Attempts:
2 left
💡 Hint
Add all timer durations plus the 2-second delay before T2 starts.
✗ Incorrect
T1 runs 8s, then 2s delay before T2 starts, T2 runs 12s, then T3 runs 5s. Total = 8 + 2 + 12 + 5 = 27 seconds.
📝 Syntax
expertIdentify the syntax error in timer cascade code snippet
Given this PLC structured text snippet for cascading timers, which option contains the syntax error?
1: IF NOT T1.Q THEN
2: T1(IN:=TRUE, PT:=T#10S);
3: ELSE
4: T2(IN T1.Q, PT:=T#5S);
5: END_IF
Attempts:
2 left
💡 Hint
Check how timer input parameters are assigned in structured text.
✗ Incorrect
Timer input parameters must be assigned with := inside the timer function call. Using T1.Q directly as IN input without := causes syntax error.