Introduction
Managing a project with many tasks can be confusing, especially when some tasks depend on others. Knowing which tasks control the overall project time helps avoid delays and keeps everything on track.
Imagine planning a road trip with several stops. Some stops must happen before others, and the total trip time depends on the longest route segment. If one stop takes longer, the whole trip is delayed.
┌─────────┐ ┌─────────┐ ┌─────────┐
│ Task A │────▶│ Task B │────▶│ Task D │
└─────────┘ └─────────┘ └─────────┘
│ ▲
│ │
▼ │
┌─────────┐ │
│ Task C │───────────────────────┘
└─────────┘