Agile methodology basics in Intro to Computing - Draw & Build Visually

Choose your learning style10 modes available
Draw This - beginner

Draw a flowchart that shows the basic cycle of Agile methodology including the steps: Plan, Design, Develop, Test, Review, and Repeat.

10 minutes
Hint 1
Hint 2
Hint 3
Hint 4
Hint 5
Grading Criteria
Start symbol present
All five steps (Plan, Design, Develop, Test, Review) shown as rectangles
Arrows correctly connect steps in the right order
Loop from Review back to Plan clearly shown
No end symbol included (correct for Agile cycle)
Solution
  _______       _______       _______       _______       _______
 | Start | --> | Plan  | --> | Design| --> |Develop| --> | Test  |
  -------       -------       -------       -------       -------
                                                         |
                                                         v
                                                      _______
                                                     |Review |
                                                      -------
                                                         |
                                                         v
                                                      (loop back to Plan)

This flowchart starts with the Start symbol, then moves through the main Agile steps: Plan, Design, Develop, Test, and Review.

After Review, the process loops back to Plan to show that Agile is an ongoing cycle of improvement and iteration.

Each step is represented by a rectangle, and arrows show the direction of the workflow.

There is no end symbol because Agile projects continuously repeat these steps.

Variations - 2 Challenges
[intermediate] Draw a flowchart for Agile methodology that includes an additional step for 'Deploy' after 'Review' before looping back to 'Plan'.
[advanced] Draw a detailed flowchart for Agile methodology including the steps: Plan, Design, Develop, Test, Review, Deploy, and Feedback, showing the flow and loops between them.

Practice

(1/5)
1. What is the main purpose of breaking a project into sprints in Agile methodology?
easy
A. To complete the entire project in one go without breaks
B. To make the project easier to manage and deliver in small parts
C. To avoid any communication within the team
D. To delay feedback until the project is finished

Solution

  1. Step 1: Understand Agile sprint concept

    Agile divides big projects into smaller parts called sprints to manage work better.
  2. Step 2: Identify the purpose of sprints

    Sprints help teams focus on small goals, making progress visible and manageable.
  3. Final Answer:

    To make the project easier to manage and deliver in small parts -> Option B
  4. Quick Check:

    Agile sprints = small, manageable parts [OK]
Hint: Sprints mean small parts, not one big chunk [OK]
Common Mistakes:
  • Thinking sprints mean working without breaks
  • Believing sprints avoid team communication
  • Assuming feedback is delayed until project end
2. Which of the following is the correct sequence of phases in an Agile sprint?
easy
A. Review, Improve, Plan, Work
B. Work, Plan, Improve, Review
C. Plan, Work, Review, Improve
D. Improve, Review, Work, Plan

Solution

  1. Step 1: Recall Agile sprint phases

    Agile sprints start with planning, then working, followed by review and improvement.
  2. Step 2: Match the correct order

    Plan, Work, Review, Improve matches the correct sequence: Plan, Work, Review, Improve.
  3. Final Answer:

    Plan, Work, Review, Improve -> Option C
  4. Quick Check:

    Sprint phases = Plan -> Work -> Review -> Improve [OK]
Hint: Remember: Plan before work, then review and improve [OK]
Common Mistakes:
  • Mixing up the order of phases
  • Starting with work before planning
  • Skipping the review phase
3. Consider this Agile team scenario: The team completes a sprint and holds a retrospective meeting. What is the main outcome of this retrospective?
medium
A. To identify what went well and what can be improved
B. To assign blame for missed tasks
C. To finalize the entire project without changes
D. To stop all communication until the next sprint

Solution

  1. Step 1: Understand the purpose of sprint retrospective

    The sprint retrospective is a meeting to discuss successes and areas for improvement.
  2. Step 2: Identify the correct outcome

    The team focuses on learning and improving, not blaming or stopping communication.
  3. Final Answer:

    To identify what went well and what can be improved -> Option A
  4. Quick Check:

    Sprint retrospective = learn and improve [OK]
Hint: Retrospective means learn, not blame or stop [OK]
Common Mistakes:
  • Thinking retrospective is for blaming team members
  • Assuming project is finalized at retrospective
  • Believing communication stops after retrospective
4. A team following Agile forgot to hold daily stand-up meetings. What problem is most likely to occur?
medium
A. Lack of daily communication causing delays and misunderstandings
B. The project will automatically finish early
C. The team will have too many meetings
D. The sprint planning phase will be skipped

Solution

  1. Step 1: Understand the role of daily stand-ups

    Daily stand-ups keep the team aligned and help spot problems early.
  2. Step 2: Identify the impact of missing stand-ups

    Without daily communication, delays and misunderstandings are likely.
  3. Final Answer:

    Lack of daily communication causing delays and misunderstandings -> Option A
  4. Quick Check:

    Missing stand-ups = poor communication [OK]
Hint: Daily stand-ups prevent delays and confusion [OK]
Common Mistakes:
  • Thinking missing stand-ups speeds up project
  • Believing more meetings happen without stand-ups
  • Assuming sprint planning is skipped
5. A product owner wants to improve team flexibility by adjusting sprint length based on project needs. Which Agile principle supports this approach?
hard
A. Fixing sprint length regardless of project changes
B. Completing all work before any review
C. Avoiding customer feedback during sprints
D. Responding to change over following a fixed plan

Solution

  1. Step 1: Recall Agile values about change

    Agile values responding to change more than strictly following plans.
  2. Step 2: Match the principle to sprint length adjustment

    Adjusting sprint length to fit needs shows flexibility and embracing change.
  3. Final Answer:

    Responding to change over following a fixed plan -> Option D
  4. Quick Check:

    Agile principle = embrace change [OK]
Hint: Agile means adapt plans, not stick rigidly [OK]
Common Mistakes:
  • Thinking Agile avoids changes
  • Believing reviews happen only after all work
  • Assuming sprint length is always fixed