DSA Goprogramming~10 mins

Job Scheduling with Deadlines in DSA Go - Interactive Practice

Choose your learning style10 modes available
Practice - 5 Tasks
Answer the questions below
1fill in blank
easy

Complete the code to sort jobs by their deadlines in ascending order.

DSA Go
sort.Slice(jobs, func(i, j int) bool {
    return jobs[i].Deadline [1] jobs[j].Deadline
})
Drag options to blanks, or click blank then click option'
A<
B>
C==
D!=
Attempts:
3 left
💡 Hint
Common Mistakes
Using '>' will sort in descending order, which is incorrect for earliest deadline first.
Using '==' or '!=' does not define a proper order.
2fill in blank
medium

Complete the code to find the maximum deadline among all jobs.

DSA Go
maxDeadline := 0
for _, job := range jobs {
    if job.Deadline [1] maxDeadline {
        maxDeadline = job.Deadline
    }
}
Drag options to blanks, or click blank then click option'
A<
B!=
C==
D>
Attempts:
3 left
💡 Hint
Common Mistakes
Using '<' will find the minimum deadline, not maximum.
Using '==' or '!=' does not help find max value.
3fill in blank
hard

Fix the error in the code that schedules jobs to maximize profit without missing deadlines.

DSA Go
slots := make([]bool, maxDeadline)
result := make([]int, maxDeadline)
for i := range result {
    result[i] = -1
}
for i := 0; i < len(jobs); i++ {
    for j := jobs[i].Deadline - 1; j >= 0; j-- {
        if slots[j] == [1] {
            slots[j] = true
            result[j] = i
            break
        }
    }
}
Drag options to blanks, or click blank then click option'
Afalse
Btrue
Cnil
D0
Attempts:
3 left
💡 Hint
Common Mistakes
Checking for true means slot is occupied, so job can't be assigned there.
Using nil or 0 is invalid for boolean comparison.
4fill in blank
hard

Fill both blanks to print the scheduled jobs in order of their slots.

DSA Go
for i := 0; i < maxDeadline; i++ {
    if result[i] != [1] {
        fmt.Println("Job ID:", jobs[result[i]].[2])
    }
}
Drag options to blanks, or click blank then click option'
A-1
BID
CDeadline
DProfit
Attempts:
3 left
💡 Hint
Common Mistakes
Checking for 0 instead of -1 will miss unassigned slots.
Printing Deadline or Profit instead of ID is not the usual output.
5fill in blank
hard

Fill all three blanks to calculate total profit from scheduled jobs.

DSA Go
totalProfit := 0
for i := 0; i < maxDeadline; i++ {
    if result[i] != [1] {
        totalProfit += jobs[result[i]].[2]
    }
}
fmt.Println("Total Profit:", [3])
Drag options to blanks, or click blank then click option'
A-1
BProfit
CtotalProfit
DDeadline
Attempts:
3 left
💡 Hint
Common Mistakes
Using Deadline instead of Profit for summation.
Printing Deadline or jobs instead of totalProfit.

Practice

(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Schedule jobs in the order they appear without considering deadlines
B. Minimize the number of jobs scheduled
C. Maximize the total profit by scheduling jobs before their deadlines
D. Maximize the number of jobs scheduled regardless of profit

Solution

  1. Step 1: Understand the problem objective

    The problem aims to schedule jobs so that each job finishes before its deadline and the total profit is maximized.
  2. Step 2: Identify the correct goal

    Maximizing total profit while respecting deadlines is the key goal, not just scheduling all jobs or ignoring deadlines.
  3. Final Answer:

    Maximize the total profit by scheduling jobs before their deadlines -> Option C
  4. Quick Check:

    Goal = Maximize profit before deadlines [OK]
Hint: Focus on profit maximization within deadlines [OK]
Common Mistakes:
  • Ignoring deadlines and scheduling all jobs
  • Trying to minimize jobs instead of maximizing profit
  • Scheduling jobs in input order without sorting
2. Which Go data structure is best suited to efficiently pick the next available time slot when scheduling jobs by deadline?
easy
A. Map (hash table)
B. Disjoint Set (Union-Find)
C. Slice (dynamic array)
D. Linked List

Solution

  1. Step 1: Understand the scheduling requirement

    We need to quickly find and assign the latest free slot before a job's deadline.
  2. Step 2: Identify the suitable data structure

    Disjoint Set (Union-Find) efficiently tracks and merges available slots, making it ideal for this task.
  3. Final Answer:

    Disjoint Set (Union-Find) -> Option B
  4. Quick Check:

    Best structure for slot tracking = Disjoint Set [OK]
Hint: Use Disjoint Set to find free slots fast [OK]
Common Mistakes:
  • Using slices which require linear search
  • Using maps which don't track slot unions
  • Using linked lists which are inefficient for this
3. What is the output of the following Go code snippet that schedules jobs with deadlines and profits?
package main
import "fmt"
type Job struct {
  id     string
  deadline int
  profit int
}
func main() {
  jobs := []Job{{"a", 2, 100}, {"b", 1, 19}, {"c", 2, 27}, {"d", 1, 25}, {"e", 3, 15}}
  // Assume jobs are sorted by profit descending
  scheduled := []string{"a", "c", "e"}
  fmt.Println(scheduled)
}
medium
A. ["a", "c", "e"]
B. ["b", "d", "e"]
C. ["a", "b", "c"]
D. ["a", "d", "e"]

Solution

  1. Step 1: Analyze the job list and sorting

    Jobs are sorted by profit descending: a(100), c(27), d(25), b(19), e(15). The code assumes scheduled jobs are a, c, e.
  2. Step 2: Check feasibility of scheduled jobs

    Job a (deadline 2), c (deadline 2), e (deadline 3) can be scheduled without conflict, maximizing profit.
  3. Final Answer:

    ["a", "c", "e"] -> Option A
  4. Quick Check:

    Scheduled jobs = ["a", "c", "e"] [OK]
Hint: Pick jobs by profit, fit before deadlines [OK]
Common Mistakes:
  • Ignoring deadlines and picking all high profit jobs
  • Confusing job order in output
  • Assuming jobs b or d are scheduled incorrectly
4. Identify the bug in this Go code snippet for job scheduling:
func scheduleJobs(jobs []Job) []string {
  sort.Slice(jobs, func(i, j int) bool {
    return jobs[i].profit > jobs[j].profit
  })
  result := []string{}
  slots := make([]bool, len(jobs))
  for _, job := range jobs {
    for j := job.deadline; j >= 0; j-- {
      if !slots[j] {
        slots[j] = true
        result = append(result, job.id)
        break
      }
    }
  }
  return result
}
medium
A. Slots array size should be job.deadline, not len(jobs)
B. Jobs should be sorted by deadline, not profit
C. Loop index j should not go below 1
D. Loop index j should start from job.deadline - 1

Solution

  1. Step 1: Check loop index range for slot assignment

    The inner loop runs from job.deadline down to 0, but slot indices start at 0, so job.deadline is out of range.
  2. Step 2: Correct loop start index

    Loop should start at job.deadline - 1 to match zero-based indexing of slots array.
  3. Final Answer:

    Loop index j should start from job.deadline - 1 -> Option D
  4. Quick Check:

    Indexing starts at deadline-1 [OK]
Hint: Remember zero-based indexing for slots array [OK]
Common Mistakes:
  • Starting loop at job.deadline causing index out of range
  • Not sorting jobs by profit first
  • Ignoring zero-based indexing in Go slices
5. Given jobs with deadlines and profits: {J1: deadline=4, profit=70}, {J2: deadline=1, profit=80}, {J3: deadline=1, profit=30}, {J4: deadline=2, profit=100}, {J5: deadline=3, profit=40}, what is the maximum total profit achievable by scheduling jobs before their deadlines?
hard
A. 290
B. 190
C. 230
D. 240

Solution

  1. Step 1: Sort jobs by profit descending

    Order: J4(100), J2(80), J1(70), J5(40), J3(30).
  2. Step 2: Schedule jobs greedily before deadlines

    J4 deadline=2 -> slot 2
    J2 deadline=1 -> slot 1
    J1 deadline=4 -> slot 4
    J5 deadline=3 -> slot 3
    J3 deadline=1 -> slot 1 taken, skip
  3. Step 3: Calculate total profit

    100 + 80 + 70 + 40 = 290 (But only 4 slots available, all used)
  4. Step 4: Re-check slot assignment

    Slots: 1(J2), 2(J4), 3(J5), 4(J1). Total profit = 80 + 100 + 40 + 70 = 290
  5. Final Answer:

    290 -> Option A
  6. Quick Check:

    Sum profits of scheduled jobs = 290 [OK]
Hint: Schedule highest profit jobs first before deadlines [OK]
Common Mistakes:
  • Scheduling low profit jobs first
  • Ignoring deadline constraints
  • Double booking the same slot