DSA Goprogramming~20 mins

Job Scheduling with Deadlines in DSA Go - Practice Problems & Challenges

Choose your learning style10 modes available
Challenge - 5 Problems
🎖️
Job Scheduling Master
Get all challenges correct to earn this badge!
Test your skills under time pressure!
❓ Predict Output
intermediate
2:00remaining
Output of Job Scheduling with Deadlines - Simple Case
What is the output of the following Go code that schedules jobs with deadlines to maximize profit?
DSA Go
package main

import (
	"fmt"
	"sort"
)

type Job struct {
	id     string
	deadline int
	profit int
}

func jobScheduling(jobs []Job) []string {
	sort.Slice(jobs, func(i, j int) bool {
		return jobs[i].profit > jobs[j].profit
	})

	maxDeadline := 0
	for _, job := range jobs {
		if job.deadline > maxDeadline {
			maxDeadline = job.deadline
		}
	}

	slots := make([]string, maxDeadline)
	for i := range slots {
		slots[i] = ""
	}

	for _, job := range jobs {
		for d := job.deadline - 1; d >= 0; d-- {
			if slots[d] == "" {
				slots[d] = job.id
				break
			}
		}
	}

	result := []string{}
	for _, slot := range slots {
		if slot != "" {
			result = append(result, slot)
		}
	}
	return result
}

func main() {
	jobs := []Job{
		{"a", 2, 100},
		{"b", 1, 19},
		{"c", 2, 27},
		{"d", 1, 25},
		{"e", 3, 15},
	}
	result := jobScheduling(jobs)
	fmt.Println(result)
}
A["a", "c", "e"]
B["a", "b", "e"]
C["b", "d", "e"]
D["a", "d", "e"]
Attempts:
2 left
💡 Hint
Sort jobs by profit descending, then assign each job to the latest free slot before its deadline.
🧠 Conceptual
intermediate
1:30remaining
Maximum Number of Jobs Scheduled
Given a list of jobs with deadlines and profits, what is the maximum number of jobs that can be scheduled without missing deadlines?
AThe number of jobs with the highest profits only
BThe total number of jobs given
CThe maximum deadline value among all jobs
DThe minimum deadline value among all jobs
Attempts:
2 left
💡 Hint
Think about how many time slots are available to schedule jobs.
🔧 Debug
advanced
2:00remaining
Identify the Bug in Job Scheduling Code
What error will the following Go code produce when scheduling jobs with deadlines?
DSA Go
package main

import (
	"fmt"
	"sort"
)

type Job struct {
	id string
	deadline int
	profit int
}

func jobScheduling(jobs []Job) []string {
	sort.Slice(jobs, func(i, j int) bool {
		return jobs[i].profit < jobs[j].profit
	})

	maxDeadline := 0
	for _, job := range jobs {
		if job.deadline > maxDeadline {
			maxDeadline = job.deadline
		}
	}

	slots := make([]string, maxDeadline)
	for i := range slots {
		slots[i] = ""
	}

	for _, job := range jobs {
		for d := job.deadline - 1; d >= 0; d-- {
			if slots[d] == "" {
				slots[d] = job.id
				break
			}
		}
	}

	result := []string{}
	for _, slot := range slots {
		if slot != "" {
			result = append(result, slot)
		}
	}
	return result
}

func main() {
	jobs := []Job{
		{"a", 2, 100},
		{"b", 1, 19},
		{"c", 2, 27},
		{"d", 1, 25},
		{"e", 3, 15},
	}
	result := jobScheduling(jobs)
	fmt.Println(result)
}
AThe code produces a compilation error due to invalid slice initialization
BThe code runs correctly and outputs ["a", "c", "e"]
CThe code causes a runtime panic due to index out of range
DThe code outputs jobs in ascending order of profit, causing suboptimal scheduling
Attempts:
2 left
💡 Hint
Check the sorting order of jobs by profit.
🚀 Application
advanced
1:30remaining
Scheduling Jobs with Overlapping Deadlines
Given jobs with overlapping deadlines, which set of jobs maximizes total profit when scheduled?
AJobs scheduled in the order they appear in the list
BJobs with highest profits scheduled first within their deadlines
CJobs with shortest duration first regardless of profit
DJobs with earliest deadlines only
Attempts:
2 left
💡 Hint
Consider sorting jobs by profit and scheduling greedily.
❓ Predict Output
expert
2:30remaining
Output of Job Scheduling with Complex Deadlines and Profits
What is the output of the following Go code that schedules jobs with deadlines and profits?
DSA Go
package main

import (
	"fmt"
	"sort"
)

type Job struct {
	id string
	deadline int
	profit int
}

func jobScheduling(jobs []Job) []string {
	sort.Slice(jobs, func(i, j int) bool {
		return jobs[i].profit > jobs[j].profit
	})

	maxDeadline := 0
	for _, job := range jobs {
		if job.deadline > maxDeadline {
			maxDeadline = job.deadline
		}
	}

	slots := make([]string, maxDeadline)
	for i := range slots {
		slots[i] = ""
	}

	for _, job := range jobs {
		for d := job.deadline - 1; d >= 0; d-- {
			if slots[d] == "" {
				slots[d] = job.id
				break
			}
		}
	}

	result := []string{}
	for _, slot := range slots {
		if slot != "" {
			result = append(result, slot)
		}
	}
	return result
}

func main() {
	jobs := []Job{
		{"j1", 4, 70},
		{"j2", 1, 80},
		{"j3", 1, 30},
		{"j4", 2, 100},
		{"j5", 3, 40},
		{"j6", 2, 20},
	}
	result := jobScheduling(jobs)
	fmt.Println(result)
}
A["j4", "j2", "j5", "j1"]
B["j2", "j4", "j5", "j1"]
C["j4", "j5", "j1", "j6"]
D["j2", "j3", "j5", "j1"]
Attempts:
2 left
💡 Hint
Sort jobs by profit descending and assign each to the latest free slot before its deadline.

Practice

(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Schedule jobs in the order they appear without considering deadlines
B. Minimize the number of jobs scheduled
C. Maximize the total profit by scheduling jobs before their deadlines
D. Maximize the number of jobs scheduled regardless of profit

Solution

  1. Step 1: Understand the problem objective

    The problem aims to schedule jobs so that each job finishes before its deadline and the total profit is maximized.
  2. Step 2: Identify the correct goal

    Maximizing total profit while respecting deadlines is the key goal, not just scheduling all jobs or ignoring deadlines.
  3. Final Answer:

    Maximize the total profit by scheduling jobs before their deadlines -> Option C
  4. Quick Check:

    Goal = Maximize profit before deadlines [OK]
Hint: Focus on profit maximization within deadlines [OK]
Common Mistakes:
  • Ignoring deadlines and scheduling all jobs
  • Trying to minimize jobs instead of maximizing profit
  • Scheduling jobs in input order without sorting
2. Which Go data structure is best suited to efficiently pick the next available time slot when scheduling jobs by deadline?
easy
A. Map (hash table)
B. Disjoint Set (Union-Find)
C. Slice (dynamic array)
D. Linked List

Solution

  1. Step 1: Understand the scheduling requirement

    We need to quickly find and assign the latest free slot before a job's deadline.
  2. Step 2: Identify the suitable data structure

    Disjoint Set (Union-Find) efficiently tracks and merges available slots, making it ideal for this task.
  3. Final Answer:

    Disjoint Set (Union-Find) -> Option B
  4. Quick Check:

    Best structure for slot tracking = Disjoint Set [OK]
Hint: Use Disjoint Set to find free slots fast [OK]
Common Mistakes:
  • Using slices which require linear search
  • Using maps which don't track slot unions
  • Using linked lists which are inefficient for this
3. What is the output of the following Go code snippet that schedules jobs with deadlines and profits?
package main
import "fmt"
type Job struct {
  id     string
  deadline int
  profit int
}
func main() {
  jobs := []Job{{"a", 2, 100}, {"b", 1, 19}, {"c", 2, 27}, {"d", 1, 25}, {"e", 3, 15}}
  // Assume jobs are sorted by profit descending
  scheduled := []string{"a", "c", "e"}
  fmt.Println(scheduled)
}
medium
A. ["a", "c", "e"]
B. ["b", "d", "e"]
C. ["a", "b", "c"]
D. ["a", "d", "e"]

Solution

  1. Step 1: Analyze the job list and sorting

    Jobs are sorted by profit descending: a(100), c(27), d(25), b(19), e(15). The code assumes scheduled jobs are a, c, e.
  2. Step 2: Check feasibility of scheduled jobs

    Job a (deadline 2), c (deadline 2), e (deadline 3) can be scheduled without conflict, maximizing profit.
  3. Final Answer:

    ["a", "c", "e"] -> Option A
  4. Quick Check:

    Scheduled jobs = ["a", "c", "e"] [OK]
Hint: Pick jobs by profit, fit before deadlines [OK]
Common Mistakes:
  • Ignoring deadlines and picking all high profit jobs
  • Confusing job order in output
  • Assuming jobs b or d are scheduled incorrectly
4. Identify the bug in this Go code snippet for job scheduling:
func scheduleJobs(jobs []Job) []string {
  sort.Slice(jobs, func(i, j int) bool {
    return jobs[i].profit > jobs[j].profit
  })
  result := []string{}
  slots := make([]bool, len(jobs))
  for _, job := range jobs {
    for j := job.deadline; j >= 0; j-- {
      if !slots[j] {
        slots[j] = true
        result = append(result, job.id)
        break
      }
    }
  }
  return result
}
medium
A. Slots array size should be job.deadline, not len(jobs)
B. Jobs should be sorted by deadline, not profit
C. Loop index j should not go below 1
D. Loop index j should start from job.deadline - 1

Solution

  1. Step 1: Check loop index range for slot assignment

    The inner loop runs from job.deadline down to 0, but slot indices start at 0, so job.deadline is out of range.
  2. Step 2: Correct loop start index

    Loop should start at job.deadline - 1 to match zero-based indexing of slots array.
  3. Final Answer:

    Loop index j should start from job.deadline - 1 -> Option D
  4. Quick Check:

    Indexing starts at deadline-1 [OK]
Hint: Remember zero-based indexing for slots array [OK]
Common Mistakes:
  • Starting loop at job.deadline causing index out of range
  • Not sorting jobs by profit first
  • Ignoring zero-based indexing in Go slices
5. Given jobs with deadlines and profits: {J1: deadline=4, profit=70}, {J2: deadline=1, profit=80}, {J3: deadline=1, profit=30}, {J4: deadline=2, profit=100}, {J5: deadline=3, profit=40}, what is the maximum total profit achievable by scheduling jobs before their deadlines?
hard
A. 290
B. 190
C. 230
D. 240

Solution

  1. Step 1: Sort jobs by profit descending

    Order: J4(100), J2(80), J1(70), J5(40), J3(30).
  2. Step 2: Schedule jobs greedily before deadlines

    J4 deadline=2 -> slot 2
    J2 deadline=1 -> slot 1
    J1 deadline=4 -> slot 4
    J5 deadline=3 -> slot 3
    J3 deadline=1 -> slot 1 taken, skip
  3. Step 3: Calculate total profit

    100 + 80 + 70 + 40 = 290 (But only 4 slots available, all used)
  4. Step 4: Re-check slot assignment

    Slots: 1(J2), 2(J4), 3(J5), 4(J1). Total profit = 80 + 100 + 40 + 70 = 290
  5. Final Answer:

    290 -> Option A
  6. Quick Check:

    Sum profits of scheduled jobs = 290 [OK]
Hint: Schedule highest profit jobs first before deadlines [OK]
Common Mistakes:
  • Scheduling low profit jobs first
  • Ignoring deadline constraints
  • Double booking the same slot
Recommended

Ready to prove it?

Pass the test and this pattern moves unknown strong while earning +1 Grip toward your certificate.

10 questions~5 mineasy hard