1fill in blank
easy

Complete the code to sort jobs by their profit in descending order.

DSA C++
bool compare(Job a, Job b) {
    return a.profit [1] b.profit;
}
Drag options to blanks, or click blank then click option'
A>
B!=
C==
D<
Attempts:
3 left
💡 Hint
Common Mistakes
Using '<' will sort in ascending order, which is incorrect for maximizing profit.
Using '==' or '!=' does not define an order.
2fill in blank
medium

Complete the code to find the maximum deadline among all jobs.

DSA C++
int maxDeadline = 0;
for (int i = 0; i < n; i++) {
    if (jobs[i].deadline [1] maxDeadline) {
        maxDeadline = jobs[i].deadline;
    }
}
Drag options to blanks, or click blank then click option'
A<
B>
C>=
D<=
Attempts:
3 left
💡 Hint
Common Mistakes
Using '<' will find the minimum deadline, which is incorrect.
Using '<=' or '>=' may cause unnecessary updates.
3fill in blank
hard

Fix the error in the code to mark the slot as occupied after scheduling a job.

DSA C++
for (int j = jobs[i].deadline; j > 0; j--) {
    if (slot[j] == false) {
        slot[j] = [1];
        result[j] = i;
        break;
    }
}
Drag options to blanks, or click blank then click option'
A1
Bfalse
Ctrue
D0
Attempts:
3 left
💡 Hint
Common Mistakes
Assigning false will mark the slot as free, which is wrong.
Assigning 1 or 0 may cause type mismatch.
4fill in blank
hard

Fill both blanks to initialize the slot array and result array correctly.

DSA C++
bool slot[[1] + 1];
int result[[2] + 1];
for (int i = 0; i <= maxDeadline; i++) {
    slot[i] = false;
    result[i] = -1;
}
Drag options to blanks, or click blank then click option'
AmaxDeadline
Bn
CmaxProfit
Ddeadline
Attempts:
3 left
💡 Hint
Common Mistakes
Using n (number of jobs) may cause incorrect array size.
Using maxProfit or deadline variable names that are undefined.
5fill in blank
hard

Fill all three blanks to print the scheduled jobs and total profit.

DSA C++
int totalProfit = 0;
for (int i = 1; i <= maxDeadline; i++) {
    if (result[i] != -1) {
        cout << jobs[[1]].id << " ";
        totalProfit += jobs[[2]].profit;
    }
}
cout << "\nTotal Profit: " << [3] << endl;
Drag options to blanks, or click blank then click option'
Aresult[i]
Bi
CtotalProfit
Djobs[i]
Attempts:
3 left
💡 Hint
Common Mistakes
Using i as index for jobs is wrong because i is slot number, not job index.
Printing jobs[i] directly is incorrect as jobs is an array of objects.
Printing totalProfit before calculation.

Practice

(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Minimize the number of jobs scheduled
B. Schedule jobs in the order they appear without considering deadlines
C. Maximize total profit by scheduling jobs before their deadlines
D. Maximize the number of jobs scheduled regardless of profit

Solution

  1. Step 1: Understand the problem objective

    The problem aims to schedule jobs so that each job finishes before its deadline to earn profit.
  2. Step 2: Identify the optimization goal

    The goal is to maximize the total profit earned by selecting jobs that fit within their deadlines.
  3. Final Answer:

    Maximize total profit by scheduling jobs before their deadlines -> Option C
  4. Quick Check:

    Goal = Maximize profit [OK]
Hint: Focus on profit maximization within deadlines [OK]
Common Mistakes:
  • Ignoring deadlines and scheduling all jobs
  • Trying to schedule jobs in input order
  • Maximizing number of jobs instead of profit
2. Which of the following is the correct C++ syntax to sort jobs by profit in descending order using std::sort and a custom comparator?
easy
A. std::sort(jobs.begin(), jobs.end());
B. std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; });
C. std::sort(jobs.begin(), jobs.end(), compare); // where compare returns a.profit < b.profit
D. std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit < b.profit; });

Solution

  1. Step 1: Understand sorting by profit descending

    To sort descending, comparator should return true if first profit is greater than second.
  2. Step 2: Check lambda comparator syntax

    std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; }); uses a lambda returning a.profit > b.profit, which sorts descending correctly.
  3. Final Answer:

    std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; }); -> Option B
  4. Quick Check:

    Descending sort = a.profit > b.profit [OK]
Hint: Use comparator returning true if first > second for descending [OK]
Common Mistakes:
  • Using < instead of > for descending order
  • Not providing a comparator for custom sorting
  • Using default sort which sorts ascending
3. Given jobs with deadlines and profits:
jobs = [{id:1, deadline:2, profit:100}, {id:2, deadline:1, profit:19}, {id:3, deadline:2, profit:27}, {id:4, deadline:1, profit:25}, {id:5, deadline:3, profit:15}]
What is the maximum profit achievable by scheduling these jobs?
medium
A. 185
B. 190
C. 160
D. 142

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted jobs: (1,100,2), (3,27,2), (4,25,1), (2,19,1), (5,15,3)
  2. Step 2: Schedule jobs greedily before deadlines

    Schedule job 1 at slot 2, job 4 at slot 1, job 5 at slot 3. Jobs 3 and 2 cannot fit without conflict.
  3. Step 3: Calculate total profit

    Profit = 100 + 25 + 15 = 140. But check if job 3 can replace job 4 for better profit: job 3 (27) > job 4 (25), so schedule job 3 at slot 2, job 4 at slot 1 is not possible because slot 1 is taken by job 4. Instead, schedule job 3 at slot 2, job 2 at slot 1 (profit 19), job 5 at slot 3 (15). Total = 100 + 27 + 15 = 142. Better is job 1 (100), job 3 (27), job 4 (25) at slots 2,1,3 respectively? Slot 3 deadline is 3, so job 4 deadline 1 can't be at 3. So best is job 1 (100), job 3 (27), job 4 (25) at slots 2,1, no slot for job 5. Total 152. Actually, slot 3 is free for job 5 (15). So schedule job 1 at 2, job 4 at 1, job 5 at 3 = 100+25+15=140. Or job 1 at 2, job 3 at 1, job 5 at 3 = 100+27+15=142. Or job 1 at 2, job 4 at 1, job 3 can't fit. So max profit is 142.
  4. Final Answer:

    142 -> Option D
  5. Quick Check:

    Max profit = 142 [OK]
Hint: Sort by profit, schedule greedily before deadlines [OK]
Common Mistakes:
  • Scheduling jobs ignoring deadlines
  • Not sorting by profit first
  • Overlapping jobs in same time slot
4. Identify the error in the following C++ code snippet for job scheduling:
struct Job { int id, deadline, profit; };
std::vector<Job> jobs = ...;
std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit < b.profit; });
std::vector<int> slot(maxDeadline + 1, -1);
for (auto &job : jobs) {
  for (int j = job.deadline; j > 0; j--) {
    if (slot[j] == -1) {
      slot[j] = job.id;
      break;
    }
  }
}
medium
A. Sorting comparator sorts ascending instead of descending
B. Slots vector size should be maxDeadline, not maxDeadline + 1
C. Inner loop should run from 1 to job.deadline, not reverse
D. Job IDs should not be stored in slots, profits should be stored

Solution

  1. Step 1: Analyze sorting comparator

    The comparator returns true if a.profit < b.profit, which sorts ascending by profit.
  2. Step 2: Understand scheduling logic

    Jobs must be sorted descending by profit to schedule highest profit jobs first.
  3. Final Answer:

    Sorting comparator sorts ascending instead of descending -> Option A
  4. Quick Check:

    Comparator must sort descending [OK]
Hint: Sort jobs descending by profit for correct scheduling [OK]
Common Mistakes:
  • Using ascending sort comparator
  • Incorrect slot vector size off by one
  • Loop direction confusion
5. You have 6 jobs with deadlines and profits:
jobs = [{id:1, d:4, p:70}, {id:2, d:1, p:80}, {id:3, d:1, p:30}, {id:4, d:1, p:100}, {id:5, d:3, p:40}, {id:6, d:2, p:20}]
Using the job scheduling algorithm, what is the maximum profit and which jobs are scheduled?
hard
A. Profit: 230; Jobs scheduled: 4 -> 1 -> 5 -> 6
B. Profit: 220; Jobs scheduled: 4 -> 2 -> 5 -> 6
C. Profit: 240; Jobs scheduled: 4 -> 2 -> 1 -> 5
D. Profit: 210; Jobs scheduled: 4 -> 1 -> 3 -> 5

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted: (4,100,1), (2,80,1), (1,70,4), (5,40,3), (3,30,1), (6,20,2)
  2. Step 2: Schedule jobs greedily before deadlines

    Schedule job 4 at slot 1 (deadline 1), job 6 at slot 2 (deadline 2), job 5 at slot 3 (deadline 3), job 1 at slot 4 (deadline 4). Jobs 2 and 3 cannot fit because slot 1 is taken by job 4.
  3. Step 3: Calculate total profit and jobs scheduled

    Profit = 100 + 20 + 40 + 70 = 230; Scheduled jobs in order of slots: 4 -> 6 -> 5 -> 1 (slots 1,2,3,4)
  4. Final Answer:

    Profit: 230; Jobs scheduled: 4 -> 6 -> 5 -> 1 -> Option A
  5. Quick Check:

    Max profit = 230 with jobs 4,6,5,1 [OK]
Hint: Sort by profit, assign latest free slot before deadline [OK]
Common Mistakes:
  • Scheduling multiple jobs in same slot
  • Ignoring deadlines when scheduling
  • Not sorting jobs by profit first
Recommended

Ready to prove it?

Pass the test and this pattern moves unknown strong while earning +1 Grip toward your certificate.

10 questions~5 mineasy hard