What is the main goal of the Job Scheduling with Deadlines problem?
To schedule jobs in such a way that the maximum number of jobs are completed before their deadlines, maximizing total profit or count.
Click to reveal answer
beginner
In Job Scheduling with Deadlines, why do we sort jobs by profit in descending order?
Sorting by profit ensures that we try to schedule the most profitable jobs first, increasing the chance to maximize total profit.
Click to reveal answer
intermediate
What data structure is commonly used to keep track of free time slots in Job Scheduling with Deadlines?
An array or disjoint set (union-find) structure is used to efficiently find and assign free time slots before deadlines.
Click to reveal answer
intermediate
Explain the greedy choice property in Job Scheduling with Deadlines.
The greedy choice is to pick the job with the highest profit that can be scheduled before its deadline, ensuring local optimality leads to global optimality.
Click to reveal answer
advanced
What is the time complexity of the classic Job Scheduling with Deadlines algorithm using sorting and a simple array for slots?
O(n log n) due to sorting the jobs by profit, plus O(n * d) for scheduling where d is the maximum deadline, often simplified to O(n log n) if d is small or bounded.
Click to reveal answer
What is the first step in the Job Scheduling with Deadlines algorithm?
ASort jobs by profit in descending order
BSort jobs by deadline in ascending order
CSchedule jobs randomly
DAssign jobs to the earliest slot
✗ Incorrect
Sorting jobs by profit ensures we consider the most profitable jobs first.
If a job's deadline is 3, which time slots can it be scheduled in?
AOnly slot 3
BAny slot from 1 to 3
CAny slot after 3
DOnly slot 1
✗ Incorrect
Jobs must be scheduled before or on their deadline, so slots 1, 2, or 3 are valid.
What happens if no free slot is available before a job's deadline?
AThe job is scheduled anyway
BThe job's deadline is extended
CThe job is scheduled after the deadline
DThe job is skipped
✗ Incorrect
If no slot is free before the deadline, the job cannot be scheduled and is skipped.
Which algorithmic technique is mainly used in Job Scheduling with Deadlines?
ADynamic Programming
BDivide and Conquer
CGreedy Algorithm
DBacktracking
✗ Incorrect
The greedy approach picks the best local option (highest profit job) at each step.
What does the 'profit' represent in Job Scheduling with Deadlines?
AThe reward gained if the job is completed before deadline
BThe deadline of the job
CThe time taken by the job
DThe number of jobs scheduled
✗ Incorrect
Profit is the reward earned by completing the job on time.
Describe the steps to solve the Job Scheduling with Deadlines problem using a greedy approach.
Think about sorting and placing jobs in time slots.
You got /5 concepts.
Explain why sorting jobs by profit helps in maximizing total profit in Job Scheduling with Deadlines.
Consider what happens if you schedule low profit jobs first.
You got /4 concepts.
Practice
(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Minimize the number of jobs scheduled
B. Schedule jobs in the order they appear without considering deadlines
C. Maximize total profit by scheduling jobs before their deadlines
D. Maximize the number of jobs scheduled regardless of profit
Solution
Step 1: Understand the problem objective
The problem aims to schedule jobs so that each job finishes before its deadline to earn profit.
Step 2: Identify the optimization goal
The goal is to maximize the total profit earned by selecting jobs that fit within their deadlines.
Final Answer:
Maximize total profit by scheduling jobs before their deadlines -> Option C
Quick Check:
Goal = Maximize profit [OK]
Hint: Focus on profit maximization within deadlines [OK]
Common Mistakes:
Ignoring deadlines and scheduling all jobs
Trying to schedule jobs in input order
Maximizing number of jobs instead of profit
2. Which of the following is the correct C++ syntax to sort jobs by profit in descending order using std::sort and a custom comparator?
easy
A. std::sort(jobs.begin(), jobs.end());
B. std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; });
C. std::sort(jobs.begin(), jobs.end(), compare); // where compare returns a.profit < b.profit
D. std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit < b.profit; });
Solution
Step 1: Understand sorting by profit descending
To sort descending, comparator should return true if first profit is greater than second.
Step 2: Check lambda comparator syntax
std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; }); uses a lambda returning a.profit > b.profit, which sorts descending correctly.
Final Answer:
std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit > b.profit; }); -> Option B
Quick Check:
Descending sort = a.profit > b.profit [OK]
Hint: Use comparator returning true if first > second for descending [OK]
Common Mistakes:
Using < instead of > for descending order
Not providing a comparator for custom sorting
Using default sort which sorts ascending
3. Given jobs with deadlines and profits: jobs = [{id:1, deadline:2, profit:100}, {id:2, deadline:1, profit:19}, {id:3, deadline:2, profit:27}, {id:4, deadline:1, profit:25}, {id:5, deadline:3, profit:15}] What is the maximum profit achievable by scheduling these jobs?
Schedule job 1 at slot 2, job 4 at slot 1, job 5 at slot 3. Jobs 3 and 2 cannot fit without conflict.
Step 3: Calculate total profit
Profit = 100 + 25 + 15 = 140. But check if job 3 can replace job 4 for better profit: job 3 (27) > job 4 (25), so schedule job 3 at slot 2, job 4 at slot 1 is not possible because slot 1 is taken by job 4. Instead, schedule job 3 at slot 2, job 2 at slot 1 (profit 19), job 5 at slot 3 (15). Total = 100 + 27 + 15 = 142. Better is job 1 (100), job 3 (27), job 4 (25) at slots 2,1,3 respectively? Slot 3 deadline is 3, so job 4 deadline 1 can't be at 3. So best is job 1 (100), job 3 (27), job 4 (25) at slots 2,1, no slot for job 5. Total 152. Actually, slot 3 is free for job 5 (15). So schedule job 1 at 2, job 4 at 1, job 5 at 3 = 100+25+15=140. Or job 1 at 2, job 3 at 1, job 5 at 3 = 100+27+15=142. Or job 1 at 2, job 4 at 1, job 3 can't fit. So max profit is 142.
Final Answer:
142 -> Option D
Quick Check:
Max profit = 142 [OK]
Hint: Sort by profit, schedule greedily before deadlines [OK]
Common Mistakes:
Scheduling jobs ignoring deadlines
Not sorting by profit first
Overlapping jobs in same time slot
4. Identify the error in the following C++ code snippet for job scheduling:
struct Job { int id, deadline, profit; };
std::vector<Job> jobs = ...;
std::sort(jobs.begin(), jobs.end(), [](Job a, Job b){ return a.profit < b.profit; });
std::vector<int> slot(maxDeadline + 1, -1);
for (auto &job : jobs) {
for (int j = job.deadline; j > 0; j--) {
if (slot[j] == -1) {
slot[j] = job.id;
break;
}
}
}
medium
A. Sorting comparator sorts ascending instead of descending
B. Slots vector size should be maxDeadline, not maxDeadline + 1
C. Inner loop should run from 1 to job.deadline, not reverse
D. Job IDs should not be stored in slots, profits should be stored
Solution
Step 1: Analyze sorting comparator
The comparator returns true if a.profit < b.profit, which sorts ascending by profit.
Step 2: Understand scheduling logic
Jobs must be sorted descending by profit to schedule highest profit jobs first.
Final Answer:
Sorting comparator sorts ascending instead of descending -> Option A
Quick Check:
Comparator must sort descending [OK]
Hint: Sort jobs descending by profit for correct scheduling [OK]
Common Mistakes:
Using ascending sort comparator
Incorrect slot vector size off by one
Loop direction confusion
5. You have 6 jobs with deadlines and profits: jobs = [{id:1, d:4, p:70}, {id:2, d:1, p:80}, {id:3, d:1, p:30}, {id:4, d:1, p:100}, {id:5, d:3, p:40}, {id:6, d:2, p:20}] Using the job scheduling algorithm, what is the maximum profit and which jobs are scheduled?
Schedule job 4 at slot 1 (deadline 1), job 6 at slot 2 (deadline 2), job 5 at slot 3 (deadline 3), job 1 at slot 4 (deadline 4). Jobs 2 and 3 cannot fit because slot 1 is taken by job 4.
Step 3: Calculate total profit and jobs scheduled
Profit = 100 + 20 + 40 + 70 = 230; Scheduled jobs in order of slots: 4 -> 6 -> 5 -> 1 (slots 1,2,3,4)
Final Answer:
Profit: 230; Jobs scheduled: 4 -> 6 -> 5 -> 1 -> Option A
Quick Check:
Max profit = 230 with jobs 4,6,5,1 [OK]
Hint: Sort by profit, assign latest free slot before deadline [OK]
Common Mistakes:
Scheduling multiple jobs in same slot
Ignoring deadlines when scheduling
Not sorting jobs by profit first
Recommended
Ready to prove it?
Pass the test and this pattern moves unknownstrongwhile earning +1 Grip toward your certificate.