DSA Cprogramming~30 mins

Job Scheduling with Deadlines in DSA C - Build from Scratch

Choose your learning style9 modes available
Job Scheduling with Deadlines
📖 Scenario: You are managing a small workshop where different jobs need to be completed. Each job has a deadline and a profit if finished on time. You want to schedule the jobs to maximize your total profit without missing deadlines.
🎯 Goal: Build a program that schedules jobs with deadlines to maximize profit. You will create the job data, set the maximum deadline, implement the scheduling logic, and print the scheduled jobs.
📋 What You'll Learn
Create an array of jobs with exact job IDs, deadlines, and profits
Create an integer variable for the maximum deadline
Implement the job scheduling logic to select jobs maximizing profit without missing deadlines
Print the scheduled job IDs in order of their scheduled time slots
💡 Why This Matters
🌍 Real World
Job scheduling is used in manufacturing, computer task scheduling, and project management to maximize profit or efficiency.
💼 Career
Understanding job scheduling algorithms helps in roles like software development, operations management, and systems engineering.
Progress0 / 4 steps
1
Create the Job Data Structure and Jobs Array
Define a struct Job with int id, int deadline, and int profit. Then create an array called jobs with these exact entries: {1, 4, 20}, {2, 1, 10}, {3, 1, 40}, {4, 1, 30}.
DSA C
Hint

Use struct to define the job with three fields. Then create an array with the exact jobs listed.

2
Set the Maximum Deadline Variable
Create an integer variable called max_deadline and set it to 4.
DSA C
Hint

Just create an integer variable named max_deadline and assign it the value 4.

3
Implement Job Scheduling Logic
Write a function called jobScheduling that takes the jobs array, n, and max_deadline. It should schedule jobs to maximize profit without missing deadlines. Use a simple greedy approach: sort jobs by profit descending, then assign each job to the latest free slot before its deadline. Store scheduled job IDs in an array called result. Implement the scheduling logic inside jobScheduling.
DSA C
Hint

Sort jobs by profit descending. Then for each job, find the latest free slot before its deadline and assign it. Use an array to track free slots.

4
Print Scheduled Jobs
Create an integer array result of size max_deadline initialized with zeros. Call jobScheduling(jobs, n, max_deadline, result). Then print the scheduled job IDs in order separated by spaces using printf. Skip zeros (empty slots).
DSA C
Hint

Initialize the result array with zeros. Call jobScheduling. Then print the job IDs in order, skipping zeros.