Practice
n = 4 and edges = [[1,0],[1,2],[1,3]], what is the final returned list?Solution
Step 1: Initialize graph and degrees
Nodes: 0,1,2,3; edges connect 1 to 0,2,3. Degrees: 0->1, 1->3, 2->1, 3->1. Leaves initially: [0,2,3].Step 2: Trim leaves until ≤ 2 nodes remain
Remove leaves [0,2,3], decrement neighbors' degrees. Node 1 degree reduces from 3 to 0, becomes leaf. Remaining nodes = 4 - 3 = 1. Loop ends. Return [1].Final Answer:
Option D -> Option DQuick Check:
Only node 1 remains as centroid after trimming [OK]
- Returning initial leaves
- Off-by-one in loop
- Not updating degrees correctly
n courses labeled from 1 to n and a list of prerequisite pairs where each pair [a, b] means you must take course a before course b. You want to find the minimum number of semesters needed to complete all courses if you can take any number of courses in parallel as long as their prerequisites are met. Which algorithmic approach guarantees finding the minimum semesters efficiently?Solution
Step 1: Understand the problem constraints
The problem requires scheduling courses respecting prerequisites and minimizing semesters, allowing parallel courses per semester.Step 2: Identify the suitable algorithm
Kahn's Algorithm (topological sort with BFS) processes nodes with zero in-degree in batches (levels), naturally modeling semesters and ensuring minimal semesters.Final Answer:
Option C -> Option CQuick Check:
Level-by-level BFS matches semesters needed [OK]
- Thinking greedy picking minimal prerequisites works
- Confusing DFS order with minimal semester scheduling
- Trying exponential DP without pruning
Solution
Step 1: Identify number of paths
In worst case, number of paths can be exponential, roughly 2^n for DAGs with branching.Step 2: Analyze per-path cost
Each path is stored and copied when pushed to stack, costing O(n) per path. Total time is O(n * 2^n).Final Answer:
Option A -> Option AQuick Check:
Exponential paths times linear path length copying [OK]
- Ignoring path copying cost
- Confusing edge visits with path enumeration
Solution
Step 1: Understand dynamic graph updates
Recomputing from scratch is expensive; brute force DFS is too slow for repeated queries.Step 2: Incremental in-degree updates
Maintaining in-degree counts and adjusting the queue of safe nodes incrementally allows efficient updates without full recomputation.Final Answer:
Option A -> Option AQuick Check:
Incremental updates leverage Kahn's algorithm structure for dynamic graphs [OK]
- Re-running full algorithm after each update
- Using brute force DFS repeatedly
- Invalidating all memoization unnecessarily
Solution
Step 1: Understand impact of cycles
Allowing cycles means paths can be infinitely long, so maximum color count can be unbounded.Step 2: Recognize correct handling
Detecting cycles and returning -1 is necessary to indicate no finite maximum exists.Final Answer:
Option A -> Option AQuick Check:
Infinite paths imply no finite max color value; cycle detection is mandatory [OK]
- Trying to apply DP ignoring cycles or assuming memoized DFS suffices
