What is a hot standby in system design?
A hot standby is a backup system that runs simultaneously with the main system and can take over immediately if the main system fails, minimizing downtime.
Click to reveal answer
beginner
How does a warm standby differ from a hot standby?
A warm standby is a backup system that is running but not fully active; it requires some time to take over after the main system fails, unlike a hot standby which takes over immediately.
Click to reveal answer
intermediate
Why might a system use a warm standby instead of a hot standby?
Warm standby uses fewer resources and is less costly to maintain than hot standby, making it suitable when immediate failover is not critical.
Click to reveal answer
intermediate
In SCADA systems, what is the main benefit of using hot standby?
Hot standby ensures continuous monitoring and control with minimal interruption, which is critical for real-time industrial processes.
Click to reveal answer
intermediate
What happens during failover in a warm standby setup?
During failover, the warm standby system is activated and brought up to date before it fully takes control, causing a short delay in service restoration.
Click to reveal answer
Which standby type provides immediate failover with no downtime?
ANo standby
BWarm standby
CCold standby
DHot standby
What is a key characteristic of a warm standby system?
AIt is fully active and mirrors the main system.
BIt runs but requires time to become fully operational.
CIt is powered off until needed.
DIt is disconnected from the main system.
Why might a system choose warm standby over hot standby?
ATo reduce resource use and cost.
BTo ensure zero downtime.
CBecause warm standby is faster.
DBecause hot standby is less reliable.
In SCADA systems, what is the main goal of using hot standby?
ATo delay failover.
BTo save energy.
CTo ensure continuous control with minimal interruption.
DTo reduce hardware costs.
What happens during failover in a warm standby system?
ABackup system activates and synchronizes before taking control.
BSystem shuts down completely.
CNo action is taken.
DImmediate takeover with no delay.
Explain the differences between hot standby and warm standby in simple terms.
Think about how quickly the backup system can take over.
You got /4 concepts.
    Describe why a SCADA system might prefer hot standby over warm standby.
    Consider the impact of downtime in industrial control.
    You got /4 concepts.