Bird
0
0
PCB Designbi_tool~8 mins

PCB design workflow overview (schematic to manufacturing) - Dashboard Guide

Choose your learning style9 modes available
Dashboard Mode - PCB design workflow overview (schematic to manufacturing)
Goal

Understand the key steps and time spent in the PCB design process from schematic creation to manufacturing.

Sample Data: PCB Design Workflow Steps
StepDescriptionDuration (days)Responsible Team
Schematic CaptureCreating circuit diagrams5Electrical Engineers
PCB LayoutPlacing components and routing7PCB Designers
Design ReviewChecking design for errors3QA Team
Prototype FabricationMaking initial PCB samples10Manufacturing
Testing & ValidationVerifying prototype functionality6Test Engineers
Final AdjustmentsFixing issues found in testing4Design Team
Manufacturing SetupPreparing for mass production5Manufacturing
Dashboard Components
  • KPI Card: Total Project Duration - Sum of all step durations.
    Formula: Total Duration = SUM('Duration (days)')
    Result: 40 days
  • Bar Chart: Duration per Step
    X-axis: Step
    Y-axis: Duration (days)
    Shows how long each step takes visually.
  • Pie Chart: Time Distribution by Responsible Team
    Groups durations by team:
    - Electrical Engineers: 5 days
    - PCB Designers: 7 days
    - QA Team: 3 days
    - Manufacturing: 15 days (Prototype Fabrication + Manufacturing Setup)
    - Test Engineers: 6 days
    - Design Team: 4 days
  • Table: Detailed Step Information
    Shows all columns from sample data for reference.
Dashboard Layout
+----------------------+-----------------------+
|      KPI Card        |     Pie Chart          |
|  Total Duration: 40d | Time by Team           |
+----------------------+-----------------------+
|                      Bar Chart                 |
|               Duration per Step                |
+-----------------------------------------------+
|                Detailed Table                   |
|          Step, Description, Duration, Team     |
+-----------------------------------------------+
Interactivity

A filter to select a Responsible Team updates:

  • Bar Chart: shows only steps by that team
  • Pie Chart: highlights selected team slice
  • Table: filters rows to selected team
  • KPI Card: updates total duration for selected team

This helps focus on specific teams' workload in the PCB design process.

Self Check

If you add a filter for Responsible Team = Manufacturing, which components update and what changes occur?

  • KPI Card: Total Duration changes to 15 days (Prototype Fabrication + Manufacturing Setup)
  • Bar Chart: shows only the two manufacturing steps with durations 10 and 5 days
  • Pie Chart: highlights Manufacturing slice only
  • Table: shows only rows for Manufacturing steps
Key Result
Dashboard shows PCB design workflow steps, durations, and team responsibilities with interactive filtering.