Bird
Raised Fist0
DSA Javascriptprogramming~30 mins

Job Scheduling with Deadlines in DSA Javascript - Build from Scratch

Choose your learning style10 modes available
Job Scheduling with Deadlines
📖 Scenario: Imagine you run a small workshop where you receive several jobs each day. Each job has a deadline and a profit if completed on time. You want to schedule jobs to maximize your total profit without missing deadlines.
🎯 Goal: Build a simple program that schedules jobs with deadlines to maximize profit. You will create a list of jobs, set a maximum deadline, select jobs to maximize profit, and finally print the scheduled jobs.
📋 What You'll Learn
Create an array of job objects with exact properties: id, deadline, and profit
Create a variable for the maximum deadline
Implement the job scheduling logic to select jobs maximizing profit without missing deadlines
Print the scheduled jobs in order of their deadlines
💡 Why This Matters
🌍 Real World
Job scheduling algorithms are used in manufacturing, computer task scheduling, and project management to maximize efficiency and profit.
💼 Career
Understanding job scheduling helps in roles like software development, operations management, and systems engineering where task prioritization is key.
Progress0 / 4 steps
1
Create the jobs array
Create an array called jobs with these exact job objects: {id: 'a', deadline: 2, profit: 100}, {id: 'b', deadline: 1, profit: 19}, {id: 'c', deadline: 2, profit: 27}, {id: 'd', deadline: 1, profit: 25}, {id: 'e', deadline: 3, profit: 15}
DSA Javascript
Hint

Use const jobs = [ ... ] and include all job objects exactly as shown.

2
Set the maximum deadline
Create a variable called maxDeadline and set it to 3.
DSA Javascript
Hint

Use const maxDeadline = 3; exactly.

3
Schedule jobs to maximize profit
Create a variable called scheduledJobs and assign it the result of scheduling jobs to maximize profit without missing deadlines. Use these steps: sort jobs by profit descending, create an array result of length maxDeadline filled with null, then for each job, place it in the latest free slot before its deadline in result. Assign result to scheduledJobs.
DSA Javascript
Hint

Sort jobs by profit descending, create an array of nulls for slots, then assign jobs to the latest free slot before their deadline.

4
Print the scheduled jobs
Use console.log to print the scheduled jobs in order of their deadlines. Print the job id for each scheduled job separated by -> . Skip null slots. For example, print a -> c -> e.
DSA Javascript
Hint

Filter out nulls, map to job ids, join with ' -> ', and print using console.log.

Practice

(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Maximize the total profit by scheduling jobs before their deadlines
B. Minimize the number of jobs scheduled
C. Schedule jobs in the order they appear without considering deadlines
D. Maximize the number of jobs scheduled regardless of profit

Solution

  1. Step 1: Understand the problem goal

    The problem aims to schedule jobs so that each job finishes before its deadline and the total profit is maximized.
  2. Step 2: Identify the objective

    Maximizing total profit means choosing jobs carefully, not just scheduling all or in order.
  3. Final Answer:

    Maximize the total profit by scheduling jobs before their deadlines -> Option A
  4. Quick Check:

    Goal = Maximize profit before deadlines [OK]
Hint: Focus on profit and deadlines to maximize earnings [OK]
Common Mistakes:
  • Ignoring deadlines and scheduling all jobs
  • Trying to schedule jobs in input order
  • Maximizing number of jobs instead of profit
2. Which of the following is the correct way to sort jobs by profit in descending order in JavaScript?
easy
A. jobs.sort((a, b) => a.profit - b.profit);
B. jobs.sort((a, b) => b.profit - a.profit);
C. jobs.sort((a, b) => a.deadline - b.deadline);
D. jobs.sort((a, b) => b.deadline - a.deadline);

Solution

  1. Step 1: Understand sorting by profit descending

    To sort descending, subtract b.profit - a.profit so higher profits come first.
  2. Step 2: Check the options

    jobs.sort((a, b) => b.profit - a.profit); uses b.profit - a.profit, which sorts descending by profit correctly.
  3. Final Answer:

    jobs.sort((a, b) => b.profit - a.profit); -> Option B
  4. Quick Check:

    Descending profit sort = b.profit - a.profit [OK]
Hint: Use b - a for descending numeric sort in JavaScript [OK]
Common Mistakes:
  • Using a.profit - b.profit which sorts ascending
  • Sorting by deadline instead of profit
  • Confusing ascending and descending order
3. Given the jobs array:
const jobs = [
  {id: 'a', deadline: 2, profit: 100},
  {id: 'b', deadline: 1, profit: 19},
  {id: 'c', deadline: 2, profit: 27},
  {id: 'd', deadline: 1, profit: 25},
  {id: 'e', deadline: 3, profit: 15}
];

After scheduling jobs to maximize profit with deadlines, which jobs are selected (in order of scheduling)?
medium
A. ['b', 'd', 'e']
B. ['a', 'c', 'e']
C. ['a', 'd']
D. ['a', 'd', 'e']

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted: a(100,2), c(27,2), d(25,1), b(19,1), e(15,3)
  2. Step 2: Schedule jobs greedily before deadlines

    Schedule 'a' at latest slot <=2 (slot 2), 'c' at latest <=2 (slot 1 since 2 taken), skip 'b' (slot 1 taken), 'd' at slot 1 (since 'c' was assigned slot 1, 'd' cannot be assigned), 'e' at latest <=3 (slot 3). Correct scheduling is 'a' at slot 2, 'd' at slot 1, 'e' at slot 3. Order: ['a', 'd', 'e']
  3. Final Answer:

    ['a', 'd', 'e'] -> Option D
  4. Quick Check:

    Max profit jobs scheduled = ['a', 'd', 'e'] [OK]
Hint: Sort by profit, assign latest free slot before deadline [OK]
Common Mistakes:
  • Scheduling jobs only by deadline order
  • Ignoring profit and picking lower profit jobs
  • Not checking slot availability before deadline
4. Consider this code snippet for job scheduling:
jobs.sort((a, b) => b.profit - a.profit);
const result = [];
const slot = Array(jobs.length).fill(false);
for (let job of jobs) {
  for (let j = 0; j <= job.deadline; j++) {
    if (!slot[j]) {
      slot[j] = true;
      result.push(job.id);
      break;
    }
  }
}
console.log(result);

What is the main bug in this code?
medium
A. The jobs array is not sorted by deadline
B. The slot array should be initialized with true, not false
C. The inner loop should run from job.deadline down to 1, not 0 up to deadline
D. The result array should store job profits, not ids

Solution

  1. Step 1: Analyze slot assignment loop

    The inner loop checks slots from 0 up to deadline, but slots should be checked from deadline down to 1 to assign latest free slot.
  2. Step 2: Understand correct slot checking order

    Checking from deadline down ensures jobs are scheduled as late as possible before deadline, maximizing slot usage.
  3. Final Answer:

    The inner loop should run from job.deadline down to 1, not 0 up to deadline -> Option C
  4. Quick Check:

    Check slots backward from deadline [OK]
Hint: Check slots backward from deadline to assign latest free slot [OK]
Common Mistakes:
  • Checking slots forward from 0 wastes early slots
  • Initializing slot array incorrectly
  • Confusing sorting criteria
5. You have jobs with deadlines and profits:
const jobs = [
  {id: 'j1', deadline: 4, profit: 70},
  {id: 'j2', deadline: 1, profit: 80},
  {id: 'j3', deadline: 1, profit: 30},
  {id: 'j4', deadline: 2, profit: 100},
  {id: 'j5', deadline: 3, profit: 40}
];

Using job scheduling with deadlines, what is the maximum total profit and which jobs are scheduled?
hard
A. Total profit 290; jobs scheduled: ['j4', 'j2', 'j1', 'j5']
B. Total profit 220; jobs scheduled: ['j2', 'j4', 'j1']
C. Total profit 240; jobs scheduled: ['j4', 'j2', 'j5', 'j3']
D. Total profit 210; jobs scheduled: ['j2', 'j4', 'j5']

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted: j4(100,2), j2(80,1), j1(70,4), j5(40,3), j3(30,1)
  2. Step 2: Schedule jobs greedily before deadlines

    Assign j4 at slot 2, j2 at slot 1, j1 at slot 4, j5 at slot 3. j3 cannot fit. Total profit: 100+80+70+40=290. Scheduled: ['j4', 'j2', 'j1', 'j5']
  3. Final Answer:

    Total profit 290; jobs scheduled: ['j4', 'j2', 'j1', 'j5'] -> Option A
  4. Quick Check:

    Max profit = 290 with jobs j4,j2,j1,j5 [OK]
Hint: Sort by profit, assign latest free slot before deadline, sum profits [OK]
Common Mistakes:
  • Not assigning jobs to latest possible slot
  • Miscounting total profit
  • Ignoring job deadlines when scheduling
Recommended

Ready to prove it?

Pass the test and this pattern moves unknown strong while earning +1 Grip toward your certificate.

10 questions~5 mineasy hard