Bird
Raised Fist0
DSA C#programming~10 mins

Job Scheduling with Deadlines in DSA C# - Execution Trace

Choose your learning style10 modes available
Concept Flow - Job Scheduling with Deadlines
Start with list of jobs
↓
Sort jobs by profit descending
↓
Initialize schedule slots as empty
↓
For each job in sorted list
↓
Find latest free slot before job deadline
↓
If slot found, assign job to slot
↓
Repeat for all jobs
↓
Output scheduled jobs and total profit
Sort jobs by profit, then assign each to the latest free slot before its deadline to maximize total profit.
Execution Sample
DSA C#
class Job {
  public int id, deadline, profit;
}

// Sort jobs by profit
// Assign jobs to slots before deadline
// Print scheduled jobs and profit
Schedules jobs with deadlines to maximize profit by placing highest profit jobs first in available slots.
Execution Table
StepCurrent Job (id, deadline, profit)ActionSlot CheckedSlot AssignedSchedule StateTotal Profit
1(4, 2, 100)Check slot 222[_, 4, _, _]100
2(2, 1, 80)Check slot 111[2, 4, _, _]180
3(1, 4, 70)Check slot 444[2, 4, _, 1]250
4(5, 3, 40)Check slot 333[2, 4, 5, 1]290
5(3, 1, 30)Check slot 1 (occupied), no slot1None[2, 4, 5, 1]290
6End of jobs---[2, 4, 5, 1]290
💡 All jobs processed or no slots available before deadlines
Variable Tracker
VariableStartAfter 1After 2After 3After 4After 5Final
schedule[_, _, _, _][_, 4, _, _][2, 4, _, _][2, 4, _, 1][2, 4, 5, 1][2, 4, 5, 1][2, 4, 5, 1]
totalProfit0100180250290290290
Key Moments - 2 Insights
Why do we check the latest slot before the job's deadline instead of the earliest?
Checking the latest slot before the deadline (see execution_table rows 1,2,3,4) allows earlier slots to remain free for other jobs with earlier deadlines, maximizing total scheduled jobs and profit.
What happens if a slot is already occupied when trying to schedule a job?
If the slot is occupied (row 5), we try earlier slots before the deadline. If none are free, the job is skipped to avoid conflicts, as shown in execution_table row 5.
Visual Quiz - 3 Questions
Test your understanding
Look at the execution_table at step 2. Which slot was assigned to job 2?
ASlot 1
BSlot 2
CSlot 3
DSlot 4
💡 Hint
Check the 'Slot Assigned' column in execution_table row 2.
At which step does the total profit first reach 250?
AStep 4
BStep 5
CStep 3
DStep 6
💡 Hint
Look at the 'Total Profit' column in execution_table rows 3 and 4.
If job 3 had a deadline of 2 instead of 1, what would happen in the schedule?
AJob 3 would be scheduled at slot 3
BJob 3 would not be scheduled
CJob 3 would be scheduled at slot 2
DJob 3 would replace job 4
💡 Hint
Refer to how slots are checked from latest to earliest before deadline in execution_table.
Concept Snapshot
Job Scheduling with Deadlines:
- Sort jobs by profit descending
- For each job, assign to latest free slot before deadline
- Skip if no slot available
- Maximizes total profit
- Schedule stored as array of slots
Full Transcript
Job Scheduling with Deadlines arranges jobs to maximize profit by sorting them by profit and placing each job in the latest available slot before its deadline. The process starts with an empty schedule. Each job is checked in order, and the latest free slot before its deadline is assigned. If no slot is free, the job is skipped. This ensures maximum profit without overlapping jobs. The schedule and total profit update step-by-step as jobs are assigned or skipped.

Practice

(1/5)
1. What is the main goal of the Job Scheduling with Deadlines problem?
easy
A. Maximize total profit by scheduling jobs before their deadlines
B. Minimize the number of jobs scheduled
C. Schedule jobs in the order they arrive without considering deadlines
D. Maximize the number of jobs scheduled regardless of profit

Solution

  1. Step 1: Understand the problem goal

    The problem aims to schedule jobs so that each job finishes before its deadline.
  2. Step 2: Identify the optimization criteria

    We want to maximize the total profit earned by scheduling jobs within their deadlines.
  3. Final Answer:

    Maximize total profit by scheduling jobs before their deadlines -> Option A
  4. Quick Check:

    Goal = Maximize profit [OK]
Hint: Focus on profit maximization within deadlines [OK]
Common Mistakes:
  • Thinking the goal is to schedule all jobs regardless of profit
  • Ignoring deadlines when scheduling
  • Assuming jobs must be scheduled in input order
2. Which of the following C# code snippets correctly sorts an array of jobs by their profit in descending order?
easy
A. Array.Sort(jobs, (a, b) => a.Profit.CompareTo(b.Profit));
B. Array.Sort(jobs, (a, b) => b.Profit.CompareTo(a.Profit));
C. jobs.OrderBy(job => job.Profit);
D. jobs.OrderByDescending(job => job.Deadline);

Solution

  1. Step 1: Identify sorting by profit descending

    Sorting by profit descending means higher profit first, so compare b.Profit to a.Profit.
  2. Step 2: Check C# syntax for Array.Sort with custom comparer

    Array.Sort with lambda (a, b) => b.Profit.CompareTo(a.Profit) sorts descending by profit.
  3. Final Answer:

    Array.Sort(jobs, (a, b) => b.Profit.CompareTo(a.Profit)); -> Option B
  4. Quick Check:

    Descending profit sort = Array.Sort(jobs, (a, b) => b.Profit.CompareTo(a.Profit)); [OK]
Hint: Use b.CompareTo(a) for descending order in C# [OK]
Common Mistakes:
  • Using a.Profit.CompareTo(b.Profit) which sorts ascending
  • Using OrderBy instead of OrderByDescending for descending
  • Sorting by deadline instead of profit
3. Given the following jobs with (JobId, Deadline, Profit): (1, 2, 100), (2, 1, 19), (3, 2, 27), (4, 1, 25), (5, 3, 15), what is the maximum profit achievable by scheduling jobs before their deadlines?
medium
A. 127
B. 115
C. 142
D. 100

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted jobs: (1,2,100), (3,2,27), (4,1,25), (2,1,19), (5,3,15)
  2. Step 2: Schedule jobs greedily before deadlines

    Schedule Job 1 at slot 2, Job 3 at slot 1 (since slot 2 taken), Job 5 at slot 3. Jobs 4 and 2 cannot be scheduled as slots 1 and 2 are taken.
  3. Step 3: Calculate total profit

    Profit = 100 + 27 + 15 = 142
  4. Final Answer:

    142 -> Option C
  5. Quick Check:

    Max profit = 142 [OK]
Hint: Schedule highest profit jobs first in latest free slot [OK]
Common Mistakes:
  • Scheduling jobs without sorting by profit
  • Assigning jobs to earliest slots instead of latest free slot
  • Counting jobs that miss deadlines
4. Identify the error in the following C# code snippet for job scheduling:
Array.Sort(jobs, (a, b) => a.Profit.CompareTo(b.Profit));
foreach (var job in jobs) {
  for (int slot = job.Deadline; slot > 0; slot--) {
    if (timeSlots[slot] == false) {
      timeSlots[slot] = true;
      totalProfit += job.Profit;
      break;
    }
  }
}
medium
A. totalProfit should be incremented outside the loop
B. Loop should start from slot = 1 to deadline, not reverse
C. timeSlots array indexing is off by one
D. Jobs are sorted in ascending profit order, should be descending

Solution

  1. Step 1: Check sorting order

    Sorting by a.Profit.CompareTo(b.Profit) sorts ascending, but we need descending to maximize profit.
  2. Step 2: Verify scheduling logic

    The loop tries to assign job to latest free slot before deadline, which is correct.
  3. Final Answer:

    Jobs are sorted in ascending profit order, should be descending -> Option D
  4. Quick Check:

    Sort descending by profit [OK]
Hint: Sort jobs by descending profit to maximize total profit [OK]
Common Mistakes:
  • Sorting ascending profit by mistake
  • Incorrect slot iteration direction
  • Misindexing timeSlots array
5. You have 4 jobs with (JobId, Deadline, Profit): (1, 4, 20), (2, 1, 10), (3, 1, 40), (4, 1, 30). Using the job scheduling algorithm, which jobs will be scheduled and what is the total profit?
hard
A. Jobs: 3, 1; Total Profit: 60
B. Jobs: 3, 4, 1; Total Profit: 90
C. Jobs: 1, 2; Total Profit: 30
D. Jobs: 4, 1; Total Profit: 50

Solution

  1. Step 1: Sort jobs by profit descending

    Sorted: (3,1,40), (4,1,30), (1,4,20), (2,1,10)
  2. Step 2: Schedule jobs in latest free slot before deadline

    Job 3 scheduled at slot 1, Job 4 cannot be scheduled (slot 1 taken), Job 1 scheduled at slot 4, Job 2 cannot be scheduled (slot 1 taken)
  3. Step 3: Calculate total profit

    Total profit = 40 + 20 = 60
  4. Final Answer:

    Jobs: 3, 1; Total Profit: 60 -> Option A
  5. Quick Check:

    Schedule highest profit jobs first [OK]
Hint: Schedule highest profit jobs first in latest free slot [OK]
Common Mistakes:
  • Trying to schedule all jobs ignoring slot availability
  • Scheduling jobs in input order
  • Not checking slot availability correctly
Recommended

Ready to prove it?

Pass the test and this pattern moves unknown strong while earning +1 Grip toward your certificate.

10 questions~5 mineasy hard