Bird
Raised Fist0

In the V-Model, if validation activities are performed too early before the product is stable, what is a likely consequence?

hard🧠 Conceptual Q15 of Q15
Testing Fundamentals - Testing Models and Approaches
In the V-Model, if validation activities are performed too early before the product is stable, what is a likely consequence?
AValidation results may be inaccurate due to incomplete product
BVerification will automatically fix all defects
CTesting phases will be skipped to save time
DRequirements will be ignored during testing
Step-by-Step Solution
Solution:
  1. Step 1: Understand timing of validation in V-Model

    Validation ensures the product meets user needs and is usually done after the product is stable.
  2. Step 2: Analyze early validation impact

    If validation happens too early, the product may be incomplete or unstable, causing inaccurate or misleading validation results.
  3. Final Answer:

    Validation results may be inaccurate due to incomplete product -> Option A
  4. Quick Check:

    Early validation = inaccurate results [OK]
Quick Trick: Validate only after product stability [OK]
Common Mistakes:
MISTAKES
  • Believing verification fixes defects automatically
  • Thinking testing phases can be skipped
  • Assuming requirements are ignored

Want More Practice?

15+ quiz questions · All difficulty levels · Free

Free Signup - Practice All Questions
More Testing Fundamentals Quizzes