What is the main purpose of configuring parallel execution in Selenium with TestNG?

easy📝 Conceptual Q11 of 15
Selenium Java - TestNG Integration
What is the main purpose of configuring parallel execution in Selenium with TestNG?
ATo run multiple tests at the same time and save execution time
BTo run tests one after another in a fixed order
CTo increase the number of test cases manually
DTo disable test execution temporarily
Step-by-Step Solution
Solution:
  1. Step 1: Understand parallel execution concept

    Parallel execution means running tests simultaneously instead of sequentially.
  2. Step 2: Identify the benefit of parallel execution

    Running tests at the same time saves overall test execution time.
  3. Final Answer:

    To run multiple tests at the same time and save execution time -> Option A
  4. Quick Check:

    Parallel execution = run tests simultaneously [OK]
Quick Trick: Parallel means running tests together to save time [OK]
Common Mistakes:
  • Thinking parallel means running tests one by one
  • Confusing parallel execution with increasing test count
  • Assuming parallel disables tests